Finding asbestos doesn't automatically mean removing it. Asbestos in good condition, where it won't be disturbed, is often left in place, recorded in the register and monitored. When work is needed, HSE sorts it into three levels, depending on the material, its condition and the job.
1. Non-licensed work
The lower-risk level. Examples include:
- Drilling a textured coating to fix a fitting.
- Removing cement sheet or gutters without breaking them.
- Short jobs on insulating board, like drilling for shelving.
What it requires: a risk assessment, trained workers and controls that keep fibres down.
2. Notifiable non-licensed work
Higher risk, with extra paperwork. Examples include:
- Removing insulating board during a refurbishment.
- Large-scale removal of textured coatings by steaming or gel.
- Removing badly damaged cement, such as after a fire or flood.
What it requires: online notification before work starts, medical checks for workers and records kept for 40 years.
3. Licensed work
The highest-risk level. Examples include:
- Removing sprayed coatings.
- Any work that may disturb pipe lagging.
- Loose fill insulation, and longer work on insulating board.
What it requires: an HSE-licensed contractor, notified to the enforcing authority at least 14 days before work starts.
Why the survey comes first
Your survey report says what each material is, and that decides which level applies. Without one, a contractor has to presume the worst. With one, the job can be scoped, priced and planned properly.