Whether the report is ours or someone else's, it is worth checking before you rely on it. A report with gaps can leave asbestos unrecorded in exactly the places someone is about to drill.
HSE's checklist
- No caveats or disclaimers you didn't agree to.
- Clear, accurate plans and diagrams.
- Every room and area accessed, or listed as not accessed and presumed to contain asbestos.
- About one or two samples per room or area, not all taken from one type of material.
What a complete report includes
- Asbestos register: each material, where it is, what it is, how much and its condition.
- Floor plans: every sample point and asbestos item marked, room by room.
- Photographs, so anyone reading the register can find each item.
- Lab results: what each sample contained, or that it was clear.
- Risk assessment: a score for each item, so you know what to deal with first.
- Recommendations: leave and monitor, seal, label or remove, and when a licensed contractor is needed.
Check who did the survey
A refurbishment or demolition survey must be done by a competent surveyor, and HSE strongly recommends using an accredited surveying organisation. UKAS is the only recognised accreditation body for asbestos inspection bodies in Great Britain. Ask for the accreditation schedule and check it covers the survey type you need.
Is it the right survey?
A management survey report can't be used to plan a strip-out. If work is coming, the areas it will touch need a refurbishment survey, even if the management report looks complete.