HSE's survey guide (HSG264) sets out two types of asbestos survey. They answer different questions, so booking the wrong one usually means paying for a second visit. The deciding factor is simple: is the building just being used, or is someone about to open it up?
Quick answer
If the building is simply being used, you need a management survey. If any work will open up walls, floors or ceilings, the area being worked on needs a refurbishment survey first. If all or part of the building is coming down, it needs a demolition survey.
The management survey
A management survey is for a building in normal use. It lets you manage any asbestos while people carry on working, living or studying around it, and it is the starting point for your asbestos register and management plan.
- It covers reasonably accessible areas, with minor intrusion such as lifting ceiling tiles and opening service hatches.
- Suspect materials are sampled for lab analysis, or presumed to contain asbestos.
- You get a register of where asbestos is, how much there is and what condition it is in, with a risk assessment for each item.
- It supports the duty to manage under regulation 4 of the Control of Asbestos Regulations 2012.
Who is the dutyholder?
Whoever has the repair and maintenance obligation for the building under a lease or contract, or whoever controls the building if there is no such agreement. The duty to manage covers non-domestic premises and the common parts of blocks of flats. Does the duty apply to your building?
The refurbishment and demolition survey
This one comes before work that opens up the building: a fit-out, refurbishment, rewire, new kitchen or bathroom, or demolition. Asbestos must be removed, as far as reasonably practicable, before major refurbishment or demolition starts, so the survey has to find what's hidden.
- It is fully intrusive. Floors are lifted and walls, ceilings, boxing and risers are opened.
- Because of that, HSE says the area must be vacated during the survey, and the surveyor confirms it is fit to reoccupy afterwards.
- It covers the areas the work will touch, or the whole structure for a demolition.
- Suspect materials in the work area are sampled and analysed, so the contractor knows exactly what is there.
The law
For final demolition or major refurbishment, regulation 7(3) of the Control of Asbestos Regulations 2012 says the plan of work must, so far as is reasonably practicable, specify that asbestos is removed before any other major works begin, unless removing it would cause a greater risk than leaving it in place.
The two surveys side by side
| Compare | Management survey | Refurbishment and demolition survey |
|---|---|---|
| When you need it | For the day-to-day running of the building, as the starting point for your register and management plan. | Before a fit-out, refurbishment, rewire, new kitchen or bathroom, or demolition. |
| How intrusive | Reasonably accessible areas, with minor intrusion such as lifting ceiling tiles and opening service hatches. | Fully intrusive. Floors are lifted and walls, ceilings, boxing and risers are opened. |
| During the survey | The building stays in normal use. | The area is vacated, then confirmed fit to reoccupy. |
| Samples | Suspect materials are sampled for lab analysis, or presumed to contain asbestos. | Suspect materials in the work area are sampled and analysed. |
| What you get | A register of where asbestos is, how much and its condition, with a risk assessment for each item. | A record of the asbestos in the work area, so it can be dealt with before work starts. |
| The law behind it | Supports the duty to manage (regulation 4). | Asbestos removed, so far as reasonably practicable, before major works (regulation 7(3)). |
Small jobs count too
Drilling, running cable or fitting new sockets can disturb asbestos as easily as a strip-out. Check your existing register for those spots first. If they aren't covered, a refurbishment survey limited to the areas being drilled or cut is the answer, and the contractor should be told what's there before they start.
When you need both
If a fit-out is planned in a building that has never had a management survey, you'll usually need a refurbishment survey of the work area and a management survey for the rest. Booking the refurbishment survey early, ideally at the design stage, keeps it from holding up the contractors.
Example
A 1970s office building has a management survey and a register. The tenant of the second floor plans a fit-out with new partitions and cabling through the ceilings. The register covers that floor's accessible areas, not what is inside the walls and ceiling voids, so the second floor needs a refurbishment survey before the fit-out starts. The rest of the building stays covered by the management survey and its register.
A quick way to decide
- Building in normal use, nothing planned: management survey.
- Work that opens up walls, floors or ceilings: refurbishment survey of the work area.
- All or part of the building coming down: demolition survey.
- Already have a register? A re-inspection checks the condition of every item in it.
Planning a fit-out, step by step
- Check the asbestos register for the areas the work will touch.
- Book a refurbishment survey of those areas early, ideally at the design stage, so it doesn't hold up the contractors.
- Give the survey report to the contractor before they start, so they know what is there.
- If asbestos has to be removed, check who is allowed to do it. Licensed work needs an HSE-licensed contractor, who notifies the enforcing authority at least 14 days before work starts. Who is allowed to work on asbestos
- Update the register and management plan afterwards. HSE says to update the plan whenever work takes place that affects asbestos materials.
Questions people ask
Can a management survey be used before refurbishment work?
Not for the areas being worked on. A management survey looks at reasonably accessible areas with minor intrusion. Before work that opens up the building, the refurbishment survey has to find asbestos hidden in the building fabric, before any structural work begins.
Does a house need a management survey?
The duty to manage doesn't apply inside individual houses or flats. But a new kitchen, bathroom or loft conversion still disturbs what's there, and before refurbishment or demolition, asbestos in the work area has to be found and dealt with, in a home or anywhere else.
How often should the findings be checked?
HSE's asbestos management plan template says to review the plan, including the register, at least every 12 months, and sooner if something changes. A re-inspection checks the condition of every item in the register.