Refurbishment

Illustration of a room cutaway with a textured ceiling, lagged pipes, a boiler and floor tiles marked as sample points

Where asbestos hides in older London buildings

Textured ceilings, floor tiles, pipe lagging, fire doors and risers: the places a surveyor checks first in a pre-2000 building.

Read more: Where asbestos hides in older London buildings
Illustration of a building cut in half: one side in normal use, the other opened up for a refurbishment survey

Management survey or refurbishment survey: which one do you need?

Two surveys, two different jobs. How to tell which one your building needs, or whether it needs both.

Read more: Management survey or refurbishment survey: which one do you need?